Designer information form
Construction (Design and Management) Regulations 2015  ·  clearcdm.co.uk/designer-form
ClearCDM

Your design risk information in whatever format you already hold it, usually your own drawings or risk register. Around ten minutes.

1. Project Reference & Your Role

As a designer under CDM 2015 (Construction (Design and Management) Regulations 2015), you must consider foreseeable risks created by your design, eliminate or reduce them where reasonably practicable, and provide information about significant residual risks to others. This form records the information the CDM Principal Designer (PD) needs to coordinate the Pre-Construction Information (PCI) and design risk information. It takes under ten minutes; your own risk assessment, register or drawings can be uploaded as they are, with nothing re-typed.

When to complete: We recommend completing this form after your first issue of design drawings, typically at RIBA Stage 2 or 3. If you are not yet at that stage, please let us know and we can agree a return date.

Abbreviations used in this form: CDM, Construction (Design and Management) Regulations 2015 · PCI Pre-Construction Information · DRA Designer’s Risk Assessment · RRR Residual Risk Review · H&S Health and Safety · R&D survey Refurbishment and Demolition survey · TW Temporary Works · PD Principal Designer · PC Principal Contractor

Helps us interpret whether your response is preliminary or final, and what further updates to expect.

Your Details

Scope of Design Responsibility

Please provide the project reference, your role, design stage, name, email address and a brief scope description before continuing.

2. Duty Acknowledgement & Competence

The Principal Designer records competence information provided by designers for the Client's review. The Client remains responsible for taking reasonable steps to appoint duty holders with suitable skills, knowledge, experience and organisational capability under CDM 2015.

CDM Designer Duty Acknowledgement

Competence Statement

A few lines is plenty. This is recorded for the Client's information under CDM 2015 Regulation 8; if you have a capability statement, you can upload it with your documents instead and say so here.

Professional Indemnity Insurance (optional)

CDM 2015 places no insurance duty on designers and we do not check or chase insurance. If you would like your PI details held on file for the Client's information, record or upload them here; otherwise skip this.
PI certificate (optional)
Max 10 MB per file.

4. Information You Need

Two quick lists, both optional. First, tick any existing information you need in order to complete your design. Second, tick anything your design has created a need for. If nothing applies, leave everything unticked and continue.

Existing information you need

Information triggered by your design

As a result of your design, is any additional information, input or specialist work required? Tick anything your design decisions have created a need for, whether or not it has been commissioned yet.

3. Design Risk Return & Documents

This section is the most important part of this form. A design risk is any residual risk created by your design that cannot be fully eliminated and which those constructing, using, or maintaining the building need to know about. Examples: structural steels requiring temporary propping during erection; confined spaces created by the layout; maintenance activities requiring access at height; materials requiring specialist handling or disposal. Please record anything significant. If you have no residual risks to report, confirm this explicitly below.

Further guidance: HSE, Designer duties under CDM 2015

How are you providing your design risk information?

Please select how you are providing your design risk information before continuing.

Documents

Upload drawings, calculations, reports, specifications or any other documents you are providing alongside this submission. For each file, select the document type and add a title or reference. Files that are too large to upload here can be sent separately to [email protected] with your project reference in the subject line.
Documents uploaded with this submission
Max 10 MB per file. For larger files, email directly to [email protected] with your project reference.

5. Looking Ahead

Health & Safety File contributions

The Health & Safety File is handed to the Client at practical completion. It records information future owners, maintenance contractors, and future designers will need to safely maintain, alter, or demolish the building.

Does your design scope generate H&S File information?

Contractor-designed (CDP) elements

Some elements of a project are designed by specialist contractors rather than the lead design team, for example, structural steelwork connections, piling, scaffold, or specialist glazing. These are known as contractor-designed (CDP) elements. As a designer, you are often best placed to identify where CDP design will be needed, so the Principal Contractor knows what to commission and can price it at tender.

This section is optional, tick any elements you anticipate will require contractor design input. If you are not aware of any at this stage, select “None anticipated” below.

6. Declaration

Please read and confirm each item before generating your submission.
Please tick all three declarations and enter your name and date before generating.
Submitting to ClearCDM…
Please wait, do not close this page.
If the submission above didn’t work, use one of these alternatives
Important: the email carries your answers only. Any files you selected above are NOT included automatically, please attach them to the email yourself before sending.
▼ Email client didn’t open? Manual copy instructions
Section 1 of 6